Sitemap
Glossary Items
- Risico analyse
- Water installations
- Volume (VOL)
- User provisions
- uPVC
- Units of measure
- Underground infrastructure
- Tiled roof
- Studding (metal)
- Standard cost level
- Standard construction
- Split units
- Site area (SA)
- Shell and core
- Sanitary and waste installations
- Risk analysis
- RICS Code of measure
- RICS
- RICS
- Regional variances
- Refurbishment
- Ratios
- Protective installations
- Project / design team fees
- Professional fees
- Procurement advice
- Open wall area (OWA)
- Office/floor area ratio
- Natural sustainable ventilation
- Main contractor's profit
- Main contractor's prelims
- Main contractor's overheads
- Lump sum extras
- Limited cooling
- Lettable floor area (LFA)
- Landscaped area
- Investment costs
- Internal walls, partitions and doors
- Internal finishes
- In use costings
- High standard
- Heating, air conditioning and ventilation
- Gross wall area (GWA)
- Gross roof area (GRA)
- Gross Internal Floor Area (GIFA)
- General costs.
- General BWIC with services
- Gang nailed trusses
- Functional units
- Frame
- Foundation
- Finish
- Facing brick
- Extruded terracotta blocks
- External works
- External walls, windows and doors
- Euro Affiliate
- EPC Energy performance certificates
- Electric installation
- Demolition, total
- Demolition to slab
- Demolition to frame
- Demolition of internals
- Cost indices
- Contract completion date
- Contingencies
- Construction costs / VOL
- Construction costs / GIFA
- Connection charges
- Cavity construction
- Cat B fit out
- Cat A fit out
- Carbon in use
- Carbon footprinting
- Bungalow
- Building project
- BCIS
- Basic standard
- Sanitary ware, basic/standard
- Bandwidth
- Balanced ventilation
- Additional costs
- Basis of estimate
- Bill of Quantities (BoQs)
- BREEAM
- Building footprint
- Capital allowances
- FF & E (furniture, fixtures and equipment)
- Level 1 and level 2 costs
- Natural ventilation.
- Performance bond
- Rebuilding cost
- Schedule of values (SOV)
- Strip foundations
- Suspended ceilings
- Water installations
- Work Breakdown Structure (WBS)